Sunnybrook Substation Forebay Expansion & Slope Re-stabilization
Client: Altalink LP
Consultant: ISL Engineering and Land Services Ltd.
Start Date: July 2016
Completion Date: December 2016
Project Scope:
Excavated and stockpiled ~50,000 m³ for new forebay
Subrage scarification and re-compaction of 150 mm depth
Installed 600 mm of thick compacted clay liner
Installed 150 mm of topsoil with track packing and hyrdoseeding
Removed and reinstalled 120 m of 1050 concrete pipe
Supplied and installed outlet control structure c/w valves and sluice gate
Removed and reinstalled existing outlet control structure on existing forebay
Relocated 200 m of fibre optic cable and general site clean-up
Supply and install ~200 meters of gabion baskets
Supply and install ~120 meters of slope retention system including re-grading, re-vegetating and miscellaneous ESC material installs