Highwood River East Bank Protection
Client: The Town of High River
Consultant: Clifton Associates
Start Date: October 2017
Completion Date: July 2018
Project Scope:
Supply and place ~18,000 m³ of Class II/III riprap armour
Installation and removal of 525 lineal meters of river isolation
Installation and removal of ~65,000 m² bird deterrent netting
Excavate and stockpile ~8000 m³ of topsoil and subsoil
Excavate, haul, place and compact ~8000 m³ of common material
Import, place and compact ~4000 m³ of clay core fill material
Import and place granular drainage material
Supply and install ~7200 m² of gravel roads
Supply and install ~11,000 m² of turf reinforcement matting (TRM)
Placement of ~35,000 m² of topsoil & subsoil
~3 hectares of field cultivation