Flood Damage Recovery and Erosion Protection - Millarville Racetrack
Client: M.D. of Foothills
Consultant: AMEC Environment and Infrastructure
Start Date: August 2014
Completion Date: October 2014
Project Scope:
Care of water and sediment control
Stream bank stabilization techniques
Including longitudinal stone toe protection
Installation of various erosion control and bio-engineering techniques
Top soiling and seeding
Supply and install bedding gravels
Supply and install debris clusters within riprap toe
Supply and install root wads within riprap toe
Supply, install and remove temporary bridge to Gaudet site
Armour an estimated 300 m of damaged river bank and install two 15 m key-ins to existing river banks