Old Man River Dam - Flood Repair
Client: Alberta Transportation
Consultant: Klohn Crippen Berger
Start Date: October 2014
Completion Date: November 2014
Project Scope:
Salvage, sort and size creek bed material deposited at the bottom of the dam’s spillway
Excavate, haul and place granular material in seepage collection pond areas
Sizing and placement of salvaged riprap for bank protection
Supply and install 3 stand pipe piezometers