Women's Coulee - Flood Mitigation
Client: M.D. of Foothills No. 31
Consultant: AMEC Foster Wheeler
Start Date: April 2014
Completion Date: May 2014
Project Scope:
Care of water and sediment control
Stream bank stabilization techniques including longitudinal stone toe protection
Installation of various erosion control and bio-engineering techniques, top soiling and seeding
Armour 330 m of riverbank with riprap
Construct 120 m out of channel riprap revetment
Supply and install root wads and articulated concrete mattress for a 1000 sm chute spillway
Installed three key-ins totaling 90 m