Sunridge Colony Domestic Wastewater Lagoon

Devcon was contracted to build a new sewage lagoon. The scope included compaction testing, a project survey, topsoil stripping, cut-to-fill, subgrade preparation, clay liner construction, borrow excavation, supplying and installing 250 mm PVC pipe with insulation and valve/pipe penetrations, supplying and installing manholes, procuring and installing chain-link fencing, and topsoil placement and seeding.

Devcon’s team handled loading, hauling, sorting, and managing various sizes of riprap, from initial blasted rock piles through to finished Class 1–4 materials. We collaborated with Lafarge’s production, crushing, and sorting plants to maintain steady material flow, ensure operational efficiency, and keep work areas clear. Our crews also helped load finished products for highway truck sales and distribution.

700

K
Contract Value

9

Pieces of Heavy Equipment Used

3

Months To Complete

10,000

m3
Topsoil Stripping and Stockpiling

Devcon process

1

Site mobilization and setup

Site mobilization included machines, fuel / materials storage, and an on-site office trailer for meetings and staff.
2

Survey and initial stripping

Performed an establish site survey, map hauling plans, and commenced with topsoil stripping and stockpiling.
3

Lagoon excavation and shaping

Excavated the lagoon, hauled common excavation within the pond from cut to fill, deepening the floor while building up the berms.
4

Clay liner construction

Constructed the clay liner: after reaching the final depth, the floor and slopes were lined with clay to retain water.
5

Piping installation and site restoration

Inlet and outlet piping and overflows were built and installed per the design plan. Trimmed, re-loamed, graded and seeded the entire site as the final step.