403 Storage (Ring Road) Ltd.

SPRINGBANK STORAGE FACILITY

Devcon completed all of the initial site prep, earthworks, underground and paving components for a new build storage facility near Springbank Rd. Because the city did not provide servicing at the site, a key project requirement involved installing water-storage tanks for fire protection.

3.5

M
CONTRACT VALUE

10

+
PIECES OF HEAVY EQUIPMENT

13

MONTHS TO COMPLETE

12,000

m3
MATERIAL REMOVED OR PLACED

Devcon process

1

Site Preparation

Completed initial site preparation, rough grading, and general clean-up, including topsoil screening and soil export.
2

Stormwater system installation and fire protection setup

Installed a comprehensive buried stormwater collection system with manholes and catch basins. Then, we stationed a fire-retention system with hydrants and buried, potable-water–filled tanks.
3

Asphalt procurement and installation

Procured and installed asphalt.
4

Concrete placement and site hand off

Assisted with site furnishings, installed concrete slabs, and ensured a successful site hand-off to building contractors.